{"name":"Transition to Motherhood in Canada","description":"","url":"http:\/\/momsproject.ca","home":"https:\/\/momsproject.ca","gmt_offset":"0","timezone_string":"","namespaces":["oembed\/1.0","wp\/v2"],"authentication":[],"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/"}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"oembed\/1.0"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/oembed\/1.0"}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true},"format":{"required":false,"default":"json"},"maxwidth":{"required":false,"default":600}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/oembed\/1.0\/embed"}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true,"description":"The URL of the resource for which to fetch oEmbed data.","type":"string"},"format":{"required":false,"default":"json","enum":["json","xml"],"description":"The oEmbed format to use.","type":"string"},"maxwidth":{"required":false,"default":600,"description":"The maximum width of the embed frame in pixels.","type":"integer"},"maxheight":{"required":false,"description":"The maximum height of the embed frame in pixels.","type":"integer"},"discover":{"required":false,"default":true,"description":"Whether to perform an oEmbed discovery request for non-whitelisted providers.","type":"boolean"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/oembed\/1.0\/proxy"}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"required":false,"default":"wp\/v2"},"context":{"required":false,"default":"view"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2"}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"after":{"required":false,"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string"},"author":{"required":false,"default":[],"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Sort collection by object attribute.","type":"string"},"slug":{"required":false,"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"}},"categories":{"required":false,"default":[],"description":"Limit result set to all items that have the specified term assigned in the categories taxonomy.","type":"array","items":{"type":"integer"}},"categories_exclude":{"required":false,"default":[],"description":"Limit result set to all items except those that have the specified term assigned in the categories taxonomy.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"default":[],"description":"Limit result set to all items that have the specified term assigned in the tags taxonomy.","type":"array","items":{"type":"integer"}},"tags_exclude":{"required":false,"default":[],"description":"Limit result set to all items except those that have the specified term assigned in the tags taxonomy.","type":"array","items":{"type":"integer"}},"sticky":{"required":false,"description":"Limit result set to items that are sticky.","type":"boolean"}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"excerpt":{"required":false,"description":"The excerpt for the object.","type":"object"},"featured_media":{"required":false,"description":"The ID of the featured media for the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"format":{"required":false,"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"description":"The format for the object.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"sticky":{"required":false,"description":"Whether or not the object should be treated as sticky.","type":"boolean"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"},"categories":{"required":false,"description":"The terms assigned to the object in the category taxonomy.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"description":"The terms assigned to the object in the post_tag taxonomy.","type":"array","items":{"type":"integer"}}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/posts"}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"password":{"required":false,"description":"The password for the post if it is password protected.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"excerpt":{"required":false,"description":"The excerpt for the object.","type":"object"},"featured_media":{"required":false,"description":"The ID of the featured media for the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"format":{"required":false,"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"description":"The format for the object.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"sticky":{"required":false,"description":"Whether or not the object should be treated as sticky.","type":"boolean"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"},"categories":{"required":false,"description":"The terms assigned to the object in the category taxonomy.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"description":"The terms assigned to the object in the post_tag taxonomy.","type":"array","items":{"type":"integer"}}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Whether to bypass trash and force deletion.","type":"boolean"}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"description":"Sort collection by object attribute.","type":"string"}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["DELETE"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Required to be true, as revisions do not support trashing.","type":"boolean"}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"excerpt":{"required":false,"description":"The excerpt for the object.","type":"object"},"featured_media":{"required":false,"description":"The ID of the featured media for the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"format":{"required":false,"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"description":"The format for the object.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"sticky":{"required":false,"description":"Whether or not the object should be treated as sticky.","type":"boolean"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"},"categories":{"required":false,"description":"The terms assigned to the object in the category taxonomy.","type":"array","items":{"type":"integer"}},"tags":{"required":false,"description":"The terms assigned to the object in the post_tag taxonomy.","type":"array","items":{"type":"integer"}}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"The ID for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"after":{"required":false,"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string"},"author":{"required":false,"default":[],"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"menu_order":{"required":false,"description":"Limit result set to posts with a specific menu_order value.","type":"integer"},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"description":"Sort collection by object attribute.","type":"string"},"parent":{"required":false,"default":[],"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"}},"parent_exclude":{"required":false,"default":[],"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"}},"slug":{"required":false,"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"excerpt":{"required":false,"description":"The excerpt for the object.","type":"object"},"featured_media":{"required":false,"description":"The ID of the featured media for the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"menu_order":{"required":false,"description":"The order of the object in relation to other object of its type.","type":"integer"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/pages"}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"password":{"required":false,"description":"The password for the post if it is password protected.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"excerpt":{"required":false,"description":"The excerpt for the object.","type":"object"},"featured_media":{"required":false,"description":"The ID of the featured media for the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"menu_order":{"required":false,"description":"The order of the object in relation to other object of its type.","type":"integer"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Whether to bypass trash and force deletion.","type":"boolean"}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"description":"Sort collection by object attribute.","type":"string"}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["DELETE"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Required to be true, as revisions do not support trashing.","type":"boolean"}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"excerpt":{"required":false,"description":"The excerpt for the object.","type":"object"},"featured_media":{"required":false,"description":"The ID of the featured media for the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"menu_order":{"required":false,"description":"The order of the object in relation to other object of its type.","type":"integer"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"The ID for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"after":{"required":false,"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string"},"author":{"required":false,"default":[],"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"default":[],"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"}},"before":{"required":false,"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Sort collection by object attribute.","type":"string"},"parent":{"required":false,"default":[],"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"}},"parent_exclude":{"required":false,"default":[],"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"}},"slug":{"required":false,"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"}},"media_type":{"required":false,"enum":["image","video","text","application","audio"],"description":"Limit result set to attachments of a particular media type.","type":"string"},"mime_type":{"required":false,"description":"Limit result set to attachments of a particular MIME type.","type":"string"}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"},"alt_text":{"required":false,"description":"Alternative text to display when attachment is not displayed.","type":"string"},"caption":{"required":false,"description":"The attachment caption.","type":"object"},"description":{"required":false,"description":"The attachment description.","type":"object"},"post":{"required":false,"description":"The ID for the associated post of the attachment.","type":"integer"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/media"}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"author":{"required":false,"description":"The ID for the author of the object.","type":"integer"},"comment_status":{"required":false,"enum":["open","closed"],"description":"Whether or not comments are open on the object.","type":"string"},"ping_status":{"required":false,"enum":["open","closed"],"description":"Whether or not the object can be pinged.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"},"alt_text":{"required":false,"description":"Alternative text to display when attachment is not displayed.","type":"string"},"caption":{"required":false,"description":"The attachment caption.","type":"object"},"description":{"required":false,"description":"The attachment description.","type":"object"},"post":{"required":false,"description":"The ID for the associated post of the attachment.","type":"integer"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Whether to bypass trash and force deletion.","type":"boolean"}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"after":{"required":false,"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string"},"before":{"required":false,"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"description":"Sort collection by object attribute.","type":"string"},"slug":{"required":false,"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"}},"status":{"required":false,"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"}}}},{"methods":["POST"],"args":{"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/blocks"}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"password":{"required":false,"description":"The password for the post if it is password protected.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Whether to bypass trash and force deletion.","type":"boolean"}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the object unique to its type.","type":"string"},"status":{"required":false,"enum":["publish","future","draft","pending","private"],"description":"A named status for the object.","type":"string"},"password":{"required":false,"description":"A password to protect access to the content and excerpt.","type":"string"},"title":{"required":false,"description":"The title for the object.","type":"object"},"content":{"required":false,"description":"The content for the object.","type":"object"},"template":{"required":false,"description":"The theme file to use to display the object.","type":"string"}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"id":{"required":false,"description":"The ID for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/types"}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"required":false,"description":"An alphanumeric identifier for the post type.","type":"string"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/statuses"}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"required":false,"description":"An alphanumeric identifier for the status.","type":"string"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"type":{"required":false,"description":"Limit results to taxonomies associated with a specific post type.","type":"string"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/taxonomies"}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"required":false,"description":"An alphanumeric identifier for the taxonomy.","type":"string"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"order":{"required":false,"default":"asc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"description":"Sort collection by term attribute.","type":"string"},"hide_empty":{"required":false,"default":false,"description":"Whether to hide terms not assigned to any posts.","type":"boolean"},"parent":{"required":false,"description":"Limit result set to terms assigned to a specific parent.","type":"integer"},"post":{"required":false,"description":"Limit result set to terms assigned to a specific post.","type":"integer"},"slug":{"required":false,"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"}}}},{"methods":["POST"],"args":{"description":{"required":false,"description":"HTML description of the term.","type":"string"},"name":{"required":true,"description":"HTML title for the term.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the term unique to its type.","type":"string"},"parent":{"required":false,"description":"The parent term ID.","type":"integer"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/categories"}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the term.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the term.","type":"integer"},"description":{"required":false,"description":"HTML description of the term.","type":"string"},"name":{"required":false,"description":"HTML title for the term.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the term unique to its type.","type":"string"},"parent":{"required":false,"description":"The parent term ID.","type":"integer"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the term.","type":"integer"},"force":{"required":false,"default":false,"description":"Required to be true, as terms do not support trashing.","type":"boolean"}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"asc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"description":"Sort collection by term attribute.","type":"string"},"hide_empty":{"required":false,"default":false,"description":"Whether to hide terms not assigned to any posts.","type":"boolean"},"post":{"required":false,"description":"Limit result set to terms assigned to a specific post.","type":"integer"},"slug":{"required":false,"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"}}}},{"methods":["POST"],"args":{"description":{"required":false,"description":"HTML description of the term.","type":"string"},"name":{"required":true,"description":"HTML title for the term.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the term unique to its type.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/tags"}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the term.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the term.","type":"integer"},"description":{"required":false,"description":"HTML description of the term.","type":"string"},"name":{"required":false,"description":"HTML title for the term.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the term unique to its type.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the term.","type":"integer"},"force":{"required":false,"default":false,"description":"Required to be true, as terms do not support trashing.","type":"boolean"}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"asc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"name","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"description":"Sort collection by object attribute.","type":"string"},"slug":{"required":false,"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"}},"roles":{"required":false,"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"}},"who":{"required":false,"enum":["authors"],"description":"Limit result set to users who are considered authors.","type":"string"}}},{"methods":["POST"],"args":{"username":{"required":true,"description":"Login name for the user.","type":"string"},"name":{"required":false,"description":"Display name for the user.","type":"string"},"first_name":{"required":false,"description":"First name for the user.","type":"string"},"last_name":{"required":false,"description":"Last name for the user.","type":"string"},"email":{"required":true,"description":"The email address for the user.","type":"string"},"url":{"required":false,"description":"URL of the user.","type":"string"},"description":{"required":false,"description":"Description of the user.","type":"string"},"locale":{"required":false,"enum":["","en_US"],"description":"Locale for the user.","type":"string"},"nickname":{"required":false,"description":"The nickname for the user.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the user.","type":"string"},"roles":{"required":false,"description":"Roles assigned to the user.","type":"array","items":{"type":"string"}},"password":{"required":true,"description":"Password for the user (never included).","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/users"}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the user.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the user.","type":"integer"},"username":{"required":false,"description":"Login name for the user.","type":"string"},"name":{"required":false,"description":"Display name for the user.","type":"string"},"first_name":{"required":false,"description":"First name for the user.","type":"string"},"last_name":{"required":false,"description":"Last name for the user.","type":"string"},"email":{"required":false,"description":"The email address for the user.","type":"string"},"url":{"required":false,"description":"URL of the user.","type":"string"},"description":{"required":false,"description":"Description of the user.","type":"string"},"locale":{"required":false,"enum":["","en_US"],"description":"Locale for the user.","type":"string"},"nickname":{"required":false,"description":"The nickname for the user.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the user.","type":"string"},"roles":{"required":false,"description":"Roles assigned to the user.","type":"array","items":{"type":"string"}},"password":{"required":false,"description":"Password for the user (never included).","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the user.","type":"integer"},"force":{"required":false,"default":false,"description":"Required to be true, as users do not support trashing.","type":"boolean"},"reassign":{"required":true,"description":"Reassign the deleted user's posts and links to this user ID.","type":"integer"}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"required":false,"description":"Login name for the user.","type":"string"},"name":{"required":false,"description":"Display name for the user.","type":"string"},"first_name":{"required":false,"description":"First name for the user.","type":"string"},"last_name":{"required":false,"description":"Last name for the user.","type":"string"},"email":{"required":false,"description":"The email address for the user.","type":"string"},"url":{"required":false,"description":"URL of the user.","type":"string"},"description":{"required":false,"description":"Description of the user.","type":"string"},"locale":{"required":false,"enum":["","en_US"],"description":"Locale for the user.","type":"string"},"nickname":{"required":false,"description":"The nickname for the user.","type":"string"},"slug":{"required":false,"description":"An alphanumeric identifier for the user.","type":"string"},"roles":{"required":false,"description":"Roles assigned to the user.","type":"array","items":{"type":"string"}},"password":{"required":false,"description":"Password for the user (never included).","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}},{"methods":["DELETE"],"args":{"force":{"required":false,"default":false,"description":"Required to be true, as users do not support trashing.","type":"boolean"},"reassign":{"required":true,"description":"Reassign the deleted user's posts and links to this user ID.","type":"integer"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/users\/me"}},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"after":{"required":false,"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string"},"author":{"required":false,"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"}},"author_exclude":{"required":false,"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"}},"author_email":{"required":false,"description":"Limit result set to that from a specific author email. Requires authorization.","type":"string"},"before":{"required":false,"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string"},"exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"}},"include":{"required":false,"default":[],"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"}},"offset":{"required":false,"description":"Offset the result set by a specific number of items.","type":"integer"},"order":{"required":false,"default":"desc","enum":["asc","desc"],"description":"Order sort attribute ascending or descending.","type":"string"},"orderby":{"required":false,"default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"description":"Sort collection by object attribute.","type":"string"},"parent":{"required":false,"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"}},"parent_exclude":{"required":false,"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"}},"post":{"required":false,"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"}},"status":{"required":false,"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string"},"type":{"required":false,"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string"},"password":{"required":false,"description":"The password for the post if it is password protected.","type":"string"}}},{"methods":["POST"],"args":{"author":{"required":false,"description":"The ID of the user object, if author was a user.","type":"integer"},"author_email":{"required":false,"description":"Email address for the object author.","type":"string"},"author_ip":{"required":false,"description":"IP address for the object author.","type":"string"},"author_name":{"required":false,"description":"Display name for the object author.","type":"string"},"author_url":{"required":false,"description":"URL for the object author.","type":"string"},"author_user_agent":{"required":false,"description":"User agent for the object author.","type":"string"},"content":{"required":false,"description":"The content for the object.","type":"object"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"parent":{"required":false,"default":0,"description":"The ID for the parent of the object.","type":"integer"},"post":{"required":false,"default":0,"description":"The ID of the associated post object.","type":"integer"},"status":{"required":false,"description":"State of the object.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/comments"}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"context":{"required":false,"default":"view","enum":["view","embed","edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"password":{"required":false,"description":"The password for the parent post of the comment (if the post is password protected).","type":"string"}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"author":{"required":false,"description":"The ID of the user object, if author was a user.","type":"integer"},"author_email":{"required":false,"description":"Email address for the object author.","type":"string"},"author_ip":{"required":false,"description":"IP address for the object author.","type":"string"},"author_name":{"required":false,"description":"Display name for the object author.","type":"string"},"author_url":{"required":false,"description":"URL for the object author.","type":"string"},"author_user_agent":{"required":false,"description":"User agent for the object author.","type":"string"},"content":{"required":false,"description":"The content for the object.","type":"object"},"date":{"required":false,"description":"The date the object was published, in the site's timezone.","type":"string"},"date_gmt":{"required":false,"description":"The date the object was published, as GMT.","type":"string"},"parent":{"required":false,"description":"The ID for the parent of the object.","type":"integer"},"post":{"required":false,"description":"The ID of the associated post object.","type":"integer"},"status":{"required":false,"description":"State of the object.","type":"string"},"meta":{"required":false,"description":"Meta fields.","type":"object"}}},{"methods":["DELETE"],"args":{"id":{"required":false,"description":"Unique identifier for the object.","type":"integer"},"force":{"required":false,"default":false,"description":"Whether to bypass trash and force deletion.","type":"boolean"},"password":{"required":false,"description":"The password for the parent post of the comment (if the post is password protected).","type":"string"}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"default":"view","enum":["view","embed"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"type":{"required":false,"default":"post","enum":["post"],"description":"Limit results to items of an object type.","type":"string"},"subtype":{"required":false,"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","any"],"type":"string"}}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/search"}},"\/wp\/v2\/block-renderer\/(?P<name>core\/block)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/block block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/latest-comments)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/latest-comments block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/archives)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/archives block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/calendar)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/calendar block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/categories)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/categories block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/latest-posts)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/latest-posts block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/rss)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/rss block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/search)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/search block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/shortcode)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/shortcode block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/block-renderer\/(?P<name>core\/tag-cloud)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"required":false,"description":"Unique registered name for the block.","type":"string"},"context":{"required":false,"default":"view","enum":["edit"],"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"attributes":{"required":false,"default":[],"description":"Attributes for core\/tag-cloud block","type":"object"},"post_id":{"required":false,"description":"ID of the post context.","type":"integer"}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"required":false,"description":"Site title.","type":"string"},"description":{"required":false,"description":"Site tagline.","type":"string"},"url":{"required":false,"description":"Site URL.","type":"string"},"email":{"required":false,"description":"This address is used for admin purposes, like new user notification.","type":"string"},"timezone":{"required":false,"description":"A city in the same timezone as you.","type":"string"},"date_format":{"required":false,"description":"A date format for all date strings.","type":"string"},"time_format":{"required":false,"description":"A time format for all time strings.","type":"string"},"start_of_week":{"required":false,"description":"A day number of the week that the week should start on.","type":"integer"},"language":{"required":false,"description":"WordPress locale code.","type":"string"},"use_smilies":{"required":false,"description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean"},"default_category":{"required":false,"description":"Default post category.","type":"integer"},"default_post_format":{"required":false,"description":"Default post format.","type":"string"},"posts_per_page":{"required":false,"description":"Blog pages show at most.","type":"integer"},"default_ping_status":{"required":false,"enum":["open","closed"],"description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string"},"default_comment_status":{"required":false,"enum":["open","closed"],"description":"Allow people to post comments on new articles.","type":"string"}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/settings"}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"required":false,"description":"Scope under which the request is made; determines fields present in response.","type":"string"},"page":{"required":false,"default":1,"description":"Current page of the collection.","type":"integer"},"per_page":{"required":false,"default":10,"description":"Maximum number of items to be returned in result set.","type":"integer"},"search":{"required":false,"description":"Limit results to those matching a string.","type":"string"},"status":{"required":true,"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active"],"type":"string"}}}}],"_links":{"self":"https:\/\/momsproject.ca\/index.php\/wp-json\/wp\/v2\/themes"}}},"_links":{"help":[{"href":"http:\/\/v2.wp-api.org\/"}]}}